Sensitive
home / Results & Publications / Deliverables / Sensitive
- D1.1 – Project Management and Quality Handbook: D1.1 summarises all procedures to be adopted by the consortium in relation to the day-to-day management of the project, including financial management, reporting and quality assurance. The document will be revised at M17 and M60.
- D1.2 - Data Management Plan: This deliverable describes how data will be collected, processed, shared and preserved, and will include Open Access and Open Data practices. It will be further update by M30 and M60.
- D10.1 - Dissemination and Communication plan: It reports the detailed Dissemination and Communication Plan foreseen in Task 10.1, as discussed and approved during the project Kick-off meeting. The plan will be revised, if needed.
- D3.1 - Engineering and detailed design of the CaL fluidized bed system and CPU: D 3.1 summarizes the engineering and details design works for the CaL fluidized bed system and CPU. The content of this Deliverable is linked to Task 3.1 ”Engineering and erection of the dual fluidized bed CaL pilot with the CO2 Purification Unit (CPU)” as part of HERCCULES Work Package 3.
- D2.2 - Engineering and detailed design of the new generation PCC pilot: D 2.2 summarizes the engineering and details the design works for Engineering of the movable skid-mounted PCC pilot, related to task 2.1. The report will detail the design, heat and mass balance of the pilot plant and its technical specifications of the main components (SO2 removal tower, DCC, Absorber, Stripper, heat exchangers for MEA extraction and CO2 Recovery with Liquid CO2 Tank
- D7.5 - Exploitation Plan: D7.5 illustrates the consortium strategy to ensure that the project innovation finds an easy and productive way to market to respond to economic, environmental and societal needs. It will be updated in M60.